Our production sites
Türkismühle website
Located in the heart of the Saarland, around 200 km from the Alsace plants, the Türkismühle site is one of the Group’s historic sites, dating back to 1934. Specialising in the assembly of ready-to-assemble furniture, the site contributes directly to the quality perceived by end customers, by ensuring precision, reliability and on-time delivery.
Committed to a policy of continuous modernisation, Türkismühle regularly upgrades its equipment and processes: energy optimisation, improved flows, renewal of production lines… all investments that enable the site to improve its performance while improving working conditions.
Anchored in its local area for almost a century, the site plays a full part in the Group’s industrial strength and agility.
Türkismühle in figures
- Since 1934
- 25 000m2
- 100 employees in production
Investments
- Installation of a facade sorter and a facade drilling machine
- Optimisation of vacuum energy, with a target saving of 40%.
- A future assembly line to replace a 30-year-old line